environmental studies
Several studies were conducted prior to building the plant. These studies included:
- Cumulative Impact Analysis for Master Water Plan projects (including desalination at 50 mgd)
- U.S Geological Survey of the Big Bend Power Station area
- Independent studies were conducted using a pilot plant by:
- Mote Marine Laboratory
- Danish Hydraulic Institute
- University of South Florida (USF)
- Savannah Laboratory/STL Precision
- Marinco Laboratory
- Hillsborough County
Each study was approved by the Florida Department of Environmental Protection (FDEP) and conducted in accordance with FDEP methods by a FDEP-approved laboratory. Each study concluded that the desalination plant would produce high-quality drinking water without harm to Tampa Bay’s water quality or marine life.