master water plan ’95

MASTER WATER PLAN - DECEMBER 1995
As Approved for Feasibility Studies
 
PHASES SUPPLY ELEMENTS PROJECTED
CAPACITY
(MGD)

Phase 0
1995-1997
Cypress Bridge Transmission Main
Tampa/Hillsborough Interconnect
Morris Bridge Transmission Main
6
8
6
Subtotal   20
 
 
Phase 1
1995-2000
Cypress Bridge Permit Increase
Tampa Bypass Canal Linear Wellfield (& North-Central Hillsborough Intertie)
Industrial/Agricultural Exchange (& South-Central Hillsborough Intertie)
Brandon Urban Wellfield
4
 
 
10
 
12
12
Subtotal   38
 
Phase 2
2000-2005
Cone Ranch & Dispersed Wells
Hillsborough Bay Resource Exchange (& Loop 72 Transmission Phase A)
12
 
 
35
Subtotal   47
Total   105
Developmental Alternatives Brackish Water Desalination
Hillsborough River High Water
Seawater Desalination
4-20
15-25
20-50
The plan includes an aggressive conservation program that is expected to reduce per capita use by 10 mgd in 2000 and
17 mgd in 2005.