master water plan ’95
|
MASTER WATER PLAN - DECEMBER 1995 As Approved for Feasibility Studies |
||
| PHASES | SUPPLY ELEMENTS |
PROJECTED CAPACITY (MGD) |
|
Phase 0 1995-1997 |
Cypress Bridge Transmission Main Tampa/Hillsborough Interconnect Morris Bridge Transmission Main |
6 8 6 |
| Subtotal | 20 | |
| Phase 1 1995-2000 |
Cypress Bridge Permit Increase Tampa Bypass Canal Linear Wellfield (& North-Central Hillsborough Intertie) Industrial/Agricultural Exchange (& South-Central Hillsborough Intertie) Brandon Urban Wellfield |
4 10 12 12 |
| Subtotal | 38 | |
| Phase 2 2000-2005 |
Cone Ranch & Dispersed Wells Hillsborough Bay Resource Exchange (& Loop 72 Transmission Phase A) |
12 35 |
| Subtotal | 47 | |
| Total | 105 | |
| Developmental Alternatives | Brackish Water Desalination Hillsborough River High Water Seawater Desalination |
4-20 15-25 20-50 |
| The plan includes an aggressive conservation program that is expected to reduce per capita use by 10 mgd in 2000 and 17 mgd in 2005. |
||